← Toolz / Calculators / Date Difference Calculator

Date Difference Calculator

Your inputs

Counts elapsed calendar days, excluding the end date; negative means the end precedes the start. Business days count the Mondays to Fridays inside the span on the same basis.

Live results

Auto-updates
Result visualization

Find the exact calendar days and weeks between two dates — with a years, months and days breakdown, a Monday-to-Friday business-day count and a count that includes both endpoints — free and instant, no signup.

100% free · No sign-up · No daily limits · No watermarks · Runs in your browser — your numbers stay on your device

UNDERSTAND YOUR RESULTS

Date Difference Calculator guide

Find the exact calendar days and weeks between two dates — with a years, months and days breakdown, a Monday-to-Friday business-day count and a count that includes both endpoints — free and instant, no signup.

How to use this tool

  1. Enter Start date, End date.
  2. Change a value to update the results and illustration. Check any validation message before using the output.
  3. Copy the results or download CSV. Reset restores the example values.

A worked example

January 1 to February 1, 2026 is 31 elapsed calendar days. Including both endpoints counts 32 dates. The breakdown reads 0 years, 1 month, 0 days, and 22 of those days are business days (Mondays to Fridays, end date excluded). From 31 January 2025 to 1 March 2026 the breakdown is 1 year, 1 month, 1 day across 394 calendar days, 281 of them business days.

What you can do with this tool

How it works

Counts elapsed calendar days, excluding the end date; negative means the end precedes the start. Business days count the Mondays to Fridays inside the span on the same basis.

Frequently asked questions

Does the day count include both the start and end dates?

By default it counts elapsed days, so 1 January to 2 January is 1 day. An inclusive count of both endpoints would call that 2 dates — the breakdown states which convention is used.

How are business days counted?

Mondays to Fridays only, with the end date excluded. Public holidays are not deducted, because they differ by country and region.

Why does the breakdown not just divide by 30-day months?

Calendar months really do vary from 28 to 31 days, so the years/months/days breakdown walks the actual calendar instead of assuming uniform months.